FOR GENERAL CONTRACTORS & CONSTRUCTION MANAGERS
WITH A SCHEDULER ON THE TEAM
Send us the schedule for a project you're running now. We'll analyse it and show you the opportunities we find.
Projects delivered for





The questions you're getting
The owner asks how likely you are to finish on time, and the honest answer is a guess.
Winter, holidays and the Christmas shutdown aren't in the logic.
The critical path tells you which tasks matter, not how much time each one costs you.
You have money for a second crew, but no way to know where it buys back the most days.
Floor-to-floor lags look harmless on their own, until they stack up.
Your scheduler is flat out keeping the plan current, with no time for what-ifs.
Acme Tower · demo project
A demo plan we built in OverVue and analysed with Anthropic's Claude: $51.26M before HST (a demo budget, not a bid). Explore it yourself below.
15 weeks
The real finish. On a Mon–Fri calendar the logic finishes on time. Replayed across 5,000 runs on 21 past Halifax winters and Nova Scotia holidays, the 50/50 finish lands about 15 working weeks later.
41.8 days
Hidden in the lags. The two floor-stagger lag sets add 12.0 and 7.9 days of drag on their own, and 41.8 days together.
5.4×
Where $80K should go. Second crews on six targeted tasks buy back about 17 days, roughly 5.4× the spend, at an assumed DRED of 65%. At 80%, the same money no longer pays.
Want to see this on one of your projects?
Book a callHow we build it
Acme Tower was planned in OverVue and analysed with Anthropic's Claude Opus 5.5, connected straight to the plan. Claude reads every task, link, duration and rate, runs the analysis and drafts the report.
Every figure is computed from the plan itself and checked against OverVue's own totals.
Proof
Numbers over adjectives. These are the receipts.
1 month
Joe Stone · Firm Formwork. “I was able to finish the project with my team a month ahead of schedule and on budget.”
18 months
Tom St. Onge. “Much more intuitive… much easier to track what's going on.”
$10B+
Alan Uren, founder. $10B+ in projects, including Transocean's Deepwater Titan: 48 days recovered on a $24M design change.
Joe Stone — General Manager
Tom St. Onge — Independent Project Leader
See what we could do on your project.
Book a callWho this is for
This is you if
+
You're a general contractor or construction manager
+
You have a project underway
+
You already have a scheduler or project controls person
+
You want to know what your schedule could be hiding
We're probably not your fit if
–
You don't have a project running right now
–
–
Several people have to approve
FAQ
What kind of opportunities?
Every project is different. On Acme Tower we found where an extra $80K of crews buys back about 17 days, two sets of floor-to-floor lags that add 41.8 days together, and two sequencing issues our review had missed.
Who sees our schedule?
Your team and ours. Your files stay confidential.
How much does it cost?
It depends on the project. Book a call and we'll quote before you commit.
How long have you been doing this?
Clients since 2023. Alan has 30 years on major projects, including Transocean's Deepwater Titan: 48 days recovered on a $24M design change.
Book a call. If it's not a fit, we'll tell you.
OverVue Planning Systems Inc.
Master schedules for trade contractors. Schedule analysis for general contractors.
alan.uren@overvue.vision
Canada